Notes on planning, P6 and Excel
Practical write ups from building schedules and the tools that check them. Primavera P6 behaviour, Excel technique, earned value and schedule quality.
Lookahead Schedule Template in Excel: Why Your Filter Drops Work
Build a lookahead schedule template in Excel that keeps live work: the overlap test, milestone and date fixes, and a one-cell check on each P6 export.
Scheduling & XERRetained Logic vs Progress Override: Why Your P6 Dates Jumped
Retained logic vs progress override decides where P6 puts the rest of an out-of-sequence activity. What each does to dates and float, and which to use.
Progress & EVMEarned Value Management Excel Template: One Table, Three Sources
An earned value management Excel template that works: one table joining the P6 baseline, progress and ledger cost, with the PV, EV, SPI and CPI formulas.
Progress & EVMS Curve in Excel: Planned and Earned Formulas From a P6 Export
Build an S curve in Excel from a P6 export: spread baseline hours over working days, stop the earned line at the data date, and keep the chart honest.
Scheduling & XERLevel of Effort Activity in Primavera P6: How to Validate It
A level of effort activity in Primavera P6 takes its dates from its links. How one goes wrong after a resequence, and five checks that catch it.
Schedule QualityDCMA 14 Point Schedule Assessment: What a Pass Does Not Prove
The DCMA 14 point schedule assessment check by check: each threshold, the P6 field it counts, and why a clean pass can still hide logic that is not true.
Excel for PlannersCompare Two XER Files in Excel Without a Comparison Tool
Compare two XER files in Excel with no add-in: match TASK rows on Activity ID, translate TASKPRED links, and list each added, deleted or changed activity.
Progress & EVMEarned Value Analysis Example When the Schedule Has No Costs
An earned value analysis example in hours for a resource loaded P6 schedule with no costs, so progress rolls up the WBS when Performance % reads 0.
Scheduling & XERWhose Calendar Does a Lag Actually Use in Primavera P6?
A two day lag in P6 is not always two days. It is measured on the predecessor calendar by default, and one scheduling option changes your dates.
Scheduling & XERHow to Review a Monthly Schedule Update in Excel (Without Opening Primavera)
A step-by-step guide to reviewing and validating a contractor's monthly P6 schedule update in Excel: checking logic changes, cost variance, float shifts, date overrides, and earned value with Plexxel's P6 Schedule Comparison.
Schedule QualitySchedule Health Check in Excel: Six Lists From One XER File
Run a schedule health check in Excel from one XER file: six lists, with the formulas, that find dangling logic, long lags and float you can trust.