Plexxel Blog

Notes on planning, P6 and Excel

Practical write ups from building schedules and the tools that check them. Primavera P6 behaviour, Excel technique, earned value and schedule quality.

Scheduling & XER

Whose Calendar Does a Lag Actually Use in Primavera P6?

A two day lag in P6 is not always two days. It is measured on the predecessor calendar by default, and one scheduling option changes your dates.

Scheduling & XER

How to Review a Monthly Schedule Update in Excel (Without Opening Primavera)

A step-by-step guide to reviewing and validating a contractor's monthly P6 schedule update in Excel: checking logic changes, cost variance, float shifts, date overrides, and earned value with Plexxel's P6 Schedule Comparison.